<span class="hide_print">Please visit <a href="http://www.adobe.com/go/getflashplayer" target="_blank">Adobe Flash Player Download Center</a> to download the latest version of Adobe Flash Player.</span>

Projects

K-12 Schools

Chautauqua Lake Central School District

Project

Pre-K thru 12th Grade

Project Goal

By utilizing the ideas of students, teachers, administration and the public, the planning process determined the design that helped establish this District's identity, image and educational presence for the 21st Century.  Set on a hillside site, this 1,200 student "educational village" is entered at the upper level into a two-story lobby that overlooks a three story atrium.

Construction Costs

$47,000,000

Project Size

New Construction - 310,000 sq. ft.

» Project Photos

Project Photos/Design Art
Project Details
  • Constructed over 4 Phases
  • Flexible Spaces
  • 900 Seat Auditorium
  • 3 Gymnasiums, Indoor Running Track
  • Swimming Pool
  • Media Center and Distance Learning Lab
  • Pre-K thru 5th Grade Wing
  • 6th thru 12th Grade Wing
  • 120 Acre Site Located on a Hill
  • Playgrounds, Tennis Courts, Soccer/Football Fields
  • Bleachers and Storage Buildings
  • 30 Bay Bus Garage/Wash
  • Maintenance/Storage Bays, Dispatch Office